In interior construction, few phases are more delicate than closeout—inspections and punchlists. At Grupo Contreras, we understand that a job can be 99% done, but that last 1% can make or break your timeline.

What Is a Punchlist?

A list of final touch-ups or corrections needed before turning over the job. It might include:

  • Surface imperfections in drywall
  • Light leaks in ACT ceilings
  • Sellos mal ejecutados
  • Limpieza o residuos dejados

Problemas comunes

  • Piling up of unresolved items
  • Crews reassigned to new jobs
  • Undocumented last-minute changes
  • Lack of tracking on corrections

Our System at Grupo Contreras

1. Internal Pre-Inspection

Before any official walkthrough, our supervisors conduct a full review using our own checklist.

2. Photo-Based Documentation

We photograph every resolved item. This avoids repeated notes and builds trust with the GC.

3. Dedicated Punchlist Teams

We keep punchlist-specific crews ready—so other areas stay on schedule.

4. GC Coordination

We align on access, sequencing, and expectations—no guesswork, no last-minute chaos.