In interior construction, few phases are more delicate than closeout—inspections and punchlists. At Grupo Contreras, we understand that a job can be 99% done, but that last 1% can make or break your timeline.
What Is a Punchlist?
A list of final touch-ups or corrections needed before turning over the job. It might include:
- Surface imperfections in drywall
- Light leaks in ACT ceilings
- Sellos mal ejecutados
- Limpieza o residuos dejados
Problemas comunes
- Piling up of unresolved items
- Crews reassigned to new jobs
- Undocumented last-minute changes
- Lack of tracking on corrections
Our System at Grupo Contreras
1. Internal Pre-Inspection
Before any official walkthrough, our supervisors conduct a full review using our own checklist.
2. Photo-Based Documentation
We photograph every resolved item. This avoids repeated notes and builds trust with the GC.
3. Dedicated Punchlist Teams
We keep punchlist-specific crews ready—so other areas stay on schedule.
4. GC Coordination
We align on access, sequencing, and expectations—no guesswork, no last-minute chaos.